![]() |
| Mass Effect: Andromeda Sidewinder |
![]() |
| Sidewinder V1 parts waiting for painting |
![]() |
| Sidewinder right side initial paintwork |
![]() |
| Sidewinder left side initial paintwork |
![]() |
| Sidewinder left side final paintwork |
![]() |
| Mass Effect: Andromeda Sidewinder |
![]() |
| Sidewinder V1 parts waiting for painting |
![]() |
| Sidewinder right side initial paintwork |
![]() |
| Sidewinder left side initial paintwork |
![]() |
| Sidewinder left side final paintwork |
![]() |
| Mini Kossel |
![]() |
| 2020 Aluminum extrusion after running steel wheels for 14 months |
![]() |
| Enlarged upper triangle |
![]() |
| Enlarged lower triangle |
![]() |
| Upgraded frame |
![]() |
| The simple way to set endstop height |
![]() |
| Parts for new rod-arms with completed arm |
![]() |
| Re-ARM and electronics installed |
![]() |
| Power supply mounting bracket |
![]() |
| Mounting bracket installed on power supply |
![]() |
| Print bed installed with dust covers |
![]() |
| Kossel on foam core for tracing |
![]() |
| Kossel and Print bed outlines on foam core |
![]() |
| Corner covers finished and installed |
![]() |
| Tennis ball feet 2/3 installed |
![]() |
| Completed Mega Kossel |
![]() |
| Workshop upgrades |
![]() |
| Wood Cart Concept |
![]() |
| Wood Cart as built with MPCNC in background |
![]() |
| Router Table |
![]() |
| Tool Chest Concept |
![]() |
| Router mounting system |
![]() |
| Power management |
![]() |
| Tool Chest as built |
![]() |
| Proteus Delta with Prometheus System installed |
![]() |
| Prometheus System half assembled with parts of effector platform |
![]() |
| Prometheus hot-end installed in effector |
![]() |
| Effector installed on Proteus for initial testing |
![]() |
| Proteus print-bed with new mounts |
![]() |
| Effector mounting plate and spool holder hardware waiting for assembly |
![]() |
| Extruders mounted to Proteus with spool holder above |
![]() |
| Proteus Delta ready to print |
![]() |
| Proteus Delta current state |
![]() |
| Power supply outputs labeled and organized. |
![]() |
| 8020 fan positions around the Duet 0.8.5 |
![]() |
| Heat-bed partially assembled for testing |
![]() |
| Proteus Delta with current rod arms |
![]() |
| Wooden rod arms being assembled |
![]() |
| How to use 6inch/150mm calipers to measure long objects with some markings |
![]() |
| Left to right: Power supply bracket, 5x20mm 5A fast-blow fuse, power plug/switch |
![]() |
| Power supply wired in and ready for securing |
![]() |
| Power supply mounted and secured |
![]() |
| Duet 0.8.5 mounting posts |
![]() |
| End-stop connector for Duet |
![]() |
| Duet 0.8.5 mounted and partially wired |
![]() |
| End-stop wire routing at the top of the towers |
![]() |
| End-stop wire routing at tower base, note the zip-tie retainer on the right |
![]() |
| Proteus Delta almost ready for motion testing |